Update on the I-40 Hernando DeSoto Bridge Repairs

MEMPHIS – TheTennessee Department of Transportation (TDOT) and the Arkansas Department of Transportation (ARDOT) are working together to safely repair and reopen the I-40 Bridge over the Mississippi River as soon as possible. After three days of intense and thorough analysis, we have the following information to share.

  • The Department met with our Structural Team, which included TDOT, ARDOT, FHWA, TDOT’s consultant Michael Baker, Inc. (MBI), and ARDOT’s consultant HNTB to go over the details of the bridge modeling.
  • There was a consistent message that, above all, the safety of the public was paramount, and the priority was to 1) open the bridge to river traffic  2) open the bridge to vehicular traffic  3) look at the bridge for long-term issues related to the original failure. 
  • There is no indication that the bridge is continuing to deteriorate. We went through an extensive bridge modeling program to be sure it was safe for river traffic.
  • We are performing additional modeling with different analytical tools to ensure quality control to have a redundant analysis before we make a final determination that the bridge is structurally stable.
  • The US Coast Guard made the decision to reopen the Mississippi River to traffic at 9:00 AM CDT this morning.
  • The design team is investigating the benefits of installing a steel plate to beef up the fractured section and thus increase our factor of safety for the existing configuration.
  • The design team is working on an interim repair design concept that contemplates using steel rods that would be attached to the bridge and span over the fractured section, and provide the needed strength to reopen the bridge to vehicular traffic.
  • The interim repair would allow time for a new bridge component to be fabricated to replace the bridge’s damaged 37’ long section.
  • ARDOT is continuing to monitor the fracture area to ensure that no additional fractures are propagating from the existing section.
  • FHWA has requested that the section of damaged steel be preserved so that a detailed forensic investigation of the plates could be done later.
  • TDOT is working with the University of Memphis to see what could be gained from some of their research activities on the bridge that might have captured some information regarding the fracture.

About Brad Jones

BBB Communications Owner/Operator Brad Jones has been part of the company since August 1996. A graduate of Coalfield High School in 1987, Brad later earned his degree from the University of Tennessee College of Communications in 1995, where he was honored with the 1995 Broadcast Production Student of the Year Award. Brad began his broadcasting career while still attending college, working at Shop at Home, Inc. from 1993 to 1995. He later worked at Via TV (RSTV, Inc.) from 1995 to 1996 before doing freelance production work in Nashville. In August 1996, he joined the staff at BBB Communications, where he has remained ever since. In 2001, Brad also spent a short time working as a news photographer for WVLT-TV while continuing his role at BBB TV. In addition to his work in local broadcasting, Brad also works part-time at Jewelry Television and works with Packman Productions on “Rivalry Thursday” during football season. Brad is married to Nicole Jenkins Jones, a 1990 graduate of Oak Ridge High School. Nicole works at Oak Ridge Gastroenterology Associates. Together they have three children: Trevor Bogard, Chandler Jones, and Naomi Jones, along with three grandchildren: Carter Bogard, Lucas Hayward, and Adalynn Reece Bogard.

Check Also

Covenant Health debuts two aircraft, expands access to lifesaving care 

Photo Courtesy of Covenant Health Covenant Health has debuted two aircraft for the Covenant Health …

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.